44-36 Douglaston Parkway

Completion Date: 2024 Project Highlights: Special inspections 44-36 Douglaston Parkway is a new 54-unit Condo community in 91,355 SF area with 8-stories (2-stories below grade). Inspection Services provided by Hirani: Concrete Cast-in-place Energy Code Compliance inspections Exterior Insulation and Finish Systems EIFS Fire-resistance Rated Construction Fire-resistance Penetration and Joints Masonry & Grout Mechanical Systems Storm […]
NYCT 8 ADA Stations – Metropolitan, Lorimer and 149th

Completion Date: 2021 Project Highlights: Topographical Survey Property Line Mapping Hirani was retained as part of the survey team to provide comprehensive survey services for three subway stations. The project was design-build engineering packages to aid in design of multiple ADA-accessible improvements. A topographic survey used to create a basemap of the road right-of-way which […]
Centre Island Fireman’s Arch

Completion Date: 2024 Since the current park entrance will be used for the Drill Team, the side access road will become the main access point. The existing ticket booth will be relocated, and a new foundation slab provided. Traffic striping and signage plans will show the new layout along with the relocation of the appropriate […]
115th Street Asphalt Paving

Completion Date: 2024 Project Highlights: Civil Site Design Survey Construction Support Hirani was retained to provide design, solicitation, and construction administration associated with milling and repaving of the Co-op’s parking lot. Hirani prepared an initial survey basemap of the site for grades associated with milling and paving. The pavement was milled across the entire width […]
Marine Parkway Bridge

Completion Date: 2024 The Work performed under this Contract was done as a design-build contract. The scope was as follows: Replacement and modernization of two (2) tower elevators systems including associated lighting in the elevator cabs, shaft way and landings and new enclosure of elevator shaft. Existing elevator systems to be replaced with rack and […]
Design and Construction of Clifton Shop

Completion Date: 2024 The project includes a new maintenance shop, administrative offices and support buildings, track work with associated DC power connections, furniture and equipment and move in services. The new Clifton Shop facility will include four maintenance tracks with overhead cranes, wheel truing machine, DC power stringer system and other maintenance-related equipment. It […]
NYSDOT Maintenance Facility

Completion Date: 2024 This project constructed a the NYSDOT’s new sub-headquarters for the northeast portion of Region 10 over a 3-acre site. The facility houses a prefabricated maintenance garage for NYSDOT trucks and equipment, a fueling station, parking amenities, and regional offices for the northeast Suffolk region. Hirani Engineering & Land Surveying P.C was retained […]
Coronet Crescent Road Reconstruction

Completion Date: 2024 A topographic survey was used to create a basemap of the road right-of-way which identified roadway profile, utility mark outs, lighting, and landscaping. The road was reconstructed and regraded to improve drainage flow along the gutter lines. All drainage and roadway design solutions were completed in accordance with the Town’s “Standards for […]