Delta Airfield Reconfiguration Program at LaGuardia Airport

Completion Date: 2026 Project Highlights: Concrete Inspection Welding Inspection Airport Redevelopment and Expansion Hirani Engineering is part of a multidisciplinary team delivering Construction Management, Civil, Structural, Electrical, and Mechanical Engineering, as well as Construction Inspection services for the comprehensive LaGuardia Airfield Reconfiguration Program. The centerpiece of the project is the construction of a new terminal […]
JFK International Airport Redevelopment On Call
Completion Date: 2025 Project Highlights: Construction Inspection and Management Services Hirani Engineering provided expert safety inspection services as part of the John F. Kennedy International Airport Redevelopment Program. Under an “as-needed” contract, Hirani supported the Port Authority by deploying a Safety Inspector and Construction Safety Specialist to perform oversight on both airside and landside construction […]
JFK International Airport Redevelopment Program

Completion Date: 2024 Project Highlights: Construction Inspection and Management Services Hirani Engineering provided a Construction Inspector to support ongoing Tenant and Port Authority (PA) Contract Work at John F. Kennedy International Airport, covering both airside and landside operations. The inspector ensured code compliance and quality assurance through comprehensive field inspections in accordance with the 2014 […]
115th Street Asphalt Paving

Completion Date: 2024 Project Highlights: Civil Site Design Survey Construction Support Hirani was retained to provide design, solicitation, and construction administration associated with milling and repaving of the Co-op’s parking lot. Hirani prepared an initial survey basemap of the site for grades associated with milling and paving. The pavement was milled across the entire width […]
Marine Parkway Bridge

Completion Date: 2024 The Work performed under this Contract was done as a design-build contract. The scope was as follows: Replacement and modernization of two (2) tower elevators systems including associated lighting in the elevator cabs, shaft way and landings and new enclosure of elevator shaft. Existing elevator systems to be replaced with rack and […]
Design and Construction of Clifton Shop

Completion Date: 2024 The project includes a new maintenance shop, administrative offices and support buildings, track work with associated DC power connections, furniture and equipment and move in services. The new Clifton Shop facility will include four maintenance tracks with overhead cranes, wheel truing machine, DC power stringer system and other maintenance-related equipment. It […]
NYSDOT Maintenance Facility

Completion Date: 2024 This project constructed a the NYSDOT’s new sub-headquarters for the northeast portion of Region 10 over a 3-acre site. The facility houses a prefabricated maintenance garage for NYSDOT trucks and equipment, a fueling station, parking amenities, and regional offices for the northeast Suffolk region. Hirani Engineering & Land Surveying P.C was retained […]
Coronet Crescent Road Reconstruction

Completion Date: 2024 A topographic survey was used to create a basemap of the road right-of-way which identified roadway profile, utility mark outs, lighting, and landscaping. The road was reconstructed and regraded to improve drainage flow along the gutter lines. All drainage and roadway design solutions were completed in accordance with the Town’s “Standards for […]