Mainline Track Replacement

Completion Date: Ongoing Project Highlights: Special Inspection and Material Testing Concrete Placement Concrete Testing Concrete Reinforcement Adhesive Anchor installation and pull testing MTA track-level The project consisted of installing approximately 16,000 feet of new MTA train track footings and foundation pads running along the 63rd St. 7 train line and Jamaica & Myrtle Avenue lines […]
Coney Island Abutment Wall & St. Marks Bridge

Completion Date: 2026 Project Highlights: Special inspection The project involves providing design-build services for a new retaining wall system at Tracks B5 & B6 at Bent #500 in Coney Island Yard/Avenue X Yard in Brooklyn. Additionally, it includes replacing the Saint Marks Ave. Viaduct Bridge located between Saint Marks Avenue and Prospect Place in Brooklyn, […]
The Studio Museum Harlem

Completion Date: 2024 Project Highlights: Special inspection The Studio Museum Harlem is a new 5-story, 82,000 SF American art museum devoted to work of artists of African descent. The new museum will contain a larger and enhanced gallery space, dedicated art receiving area, store and café, operations offices, and a climate-controlled gallery preparation suite. List […]
44-36 Douglaston Parkway

Completion Date: 2024 Project Highlights: Special inspections 44-36 Douglaston Parkway is a new 54-unit Condo community in 91,355 SF area with 8-stories (2-stories below grade). Inspection Services provided by Hirani: Concrete Cast-in-place Energy Code Compliance inspections Exterior Insulation and Finish Systems EIFS Fire-resistance Rated Construction Fire-resistance Penetration and Joints Masonry & Grout Mechanical Systems Storm […]
Design and Construction of Clifton Shop

Completion Date: 2024 The project includes a new maintenance shop, administrative offices and support buildings, track work with associated DC power connections, furniture and equipment and move in services. The new Clifton Shop facility will include four maintenance tracks with overhead cranes, wheel truing machine, DC power stringer system and other maintenance-related equipment. It […]
Marine Parkway Bridge

Completion Date: 2024 The Work performed under this Contract was done as a design-build contract. The scope was as follows: Replacement and modernization of two (2) tower elevators systems including associated lighting in the elevator cabs, shaft way and landings and new enclosure of elevator shaft. Existing elevator systems to be replaced with rack and […]