Shirley Chisolm SWPPP Inspections

Completion Date: 2024 Project Highlights: SWPPP Inspections Hirani provided land surveying and SWPPP (Stormwater Pollution Prevention Plan) inspection services for a construction project. The project involved a two-person union field crew utilizing Robotic Total Station or GPS Technology for accurate land surveying. Key Services Provided: SWPPP Inspections: Inspection Personnel & Procedures: A qualified NYCDEP-certified inspector […]
Amsterdam Houses

Completion Date: 2021 Project Highlights: Civil Site Design On-grade Slab Design Soil Erosion and Sedimentation Control Construction Support Services This project involved the installation of new underground gas lines and the restoration of excavations at the boiler room. It included replacing outdated oil boilers with natural gas systems and installing new hot water heaters in […]
115th Street Asphalt Paving

Completion Date: 2024 Project Highlights: Civil Site Design Survey Construction Support Hirani was retained to provide design, solicitation, and construction administration associated with milling and repaving of the Co-op’s parking lot. Hirani prepared an initial survey basemap of the site for grades associated with milling and paving. The pavement was milled across the entire width […]
Coronet Crescent Road Reconstruction

Completion Date: 2024 A topographic survey was used to create a basemap of the road right-of-way which identified roadway profile, utility mark outs, lighting, and landscaping. The road was reconstructed and regraded to improve drainage flow along the gutter lines. All drainage and roadway design solutions were completed in accordance with the Town’s “Standards for […]
Centre Island Fireman’s Arch

Completion Date: 2024 Since the current park entrance will be used for the Drill Team, the side access road will become the main access point. The existing ticket booth will be relocated, and a new foundation slab provided. Traffic striping and signage plans will show the new layout along with the relocation of the appropriate […]
NYSDOT Maintenance Facility

Completion Date: 2024 This project constructed a the NYSDOT’s new sub-headquarters for the northeast portion of Region 10 over a 3-acre site. The facility houses a prefabricated maintenance garage for NYSDOT trucks and equipment, a fueling station, parking amenities, and regional offices for the northeast Suffolk region. Hirani Engineering & Land Surveying P.C was retained […]